SUMMARY
Responsible, hands-on well design and operational/field
supervision of rig operations since 1980. Emphasis on cost
reduction through a blend of new technology, extensive practical
well experience and sound risk management employed daily in
project management.
EXPERIENCE
| DRILTEK, INC. |
1989- Present |
Principal ‑ Bakersfield, CA
Founder of Engineering‑Consulting Company providing drilling
and completion project management to more than one hundred major
and independent operators through a combination of professional
service, cost effective engineering and conscientious on‑site
operations management.
Developed and maintains an outstanding working relationship with
the regulatory agencies that govern the oil and gas industry of
California.
Possesses the seasoned expertise needed to develop the plan and
oversee the execution of the discovery and subsequent high
pressure/high temperature (HPHT) development wells of East Lost
Hills’ Temblor formation in access of 20,000’.
Coordinated and managed all aspects of the drilling and killing
of one of the deepest blowout well intercepts in North America
(16,532’).
Drilled the fastest well to 19,000’ in the State of California.
Developed a unique turnkey approach in a joint venture with a
local drilling contractor and drilling fluids company that has
been successfully utilized by both major and independent
operators. Most recently (2003), drilled a successful 13400’
Stevens Test for OXY Resources California LLC in the Southern
San Joaquin Valley, under turnkey contract.
Selected by a major international operator to plan and execute
an urban drilling project in North Africa.
Successfully implemented, a 35o/100’ build below 10,000’ TVD,
multiple horizontal well drilling program in the Stevens.
| ARCO OIL & GAS COMPANY |
1988 ‑ 1989 |
Senior Drilling Engineer ‑ Bakersfield, CA
Designed and critiqued wells in California, incorporating
risk management philosophy into well designs. Implemented
improved method for spotting fluid around stuck pipe,
dramatically reducing fishing costs.
| TENNECO OIL EXPLORATION & PRODUCTION |
1980 ‑ 1988 |
Senior Drilling Engineer ‑ Bakersfield, CA
(1985‑1988)
Planned and supervised a variety of drilling and completion
projects throughout California and Oregon ranging in depth from
700' to 18,000'. Initiated the use of polymer mud systems
on deep wells in the San Joaquin Valley, realizing a significant
reduction in drilling costs at Landslide and Yowlumne Fields.
Drilling Engineer ‑ Bakersfield, CA
(1980‑1984)
Co‑authored SPE Paper #12790, entitled "PDC Bits Find
Application in San Joaquin Valley" after initiating first
successful PDC bit runs. Utilized the first permanent
packer whipstocks in the San Joaquin Valley for redrilling deep
wells at a significant cost savings.
EDUCATION
B.S. Petroleum Engineering, University of Tulsa, 1980
|