SUMMARY
Diversified international and domestic operations experience as
an engineer and project manager for both operators and service
companies.
EXPERIENCE
| DRILTEK, INC. |
1999 ‑ Present |
Senior Project Engineer & Principal -
Bakersfield, CA
Consulting project engineer for a variety of oil and gas well
drilling, completion, workover and abandonment programs in
California and Oregon. Responsible for well planning, cost
estimates, daily operations management, post-job analysis and
reporting. Functioned as operations manager for a large
independent oil/gas operator, overseeing a multi-rig drilling
project.
| OCCIDENTAL OIL & GAS COMPANY |
1998 ‑ 1999 |
Senior Drilling Engineer - Elk Hills, CA
Designed and implemented a variety of drilling programs with
heavy emphasis on horizontal drilling and slotted liner completions
ranging from 3000' to 9000' TVD. Received Oxy’s 1999
Engineering Excellence Award for a 10-well horizontal project.
| BAKER HUGHES INTEQ |
1995 ‑ 1998 |
Project Manager, Oryx Alliance - Quito, Ecuador
(1996‑1998)
Managed an 11,000' drilling operation for the Oryx Ecuador-Baker
Hughes INTEQ Alliance. Supervised a staff including expatriate
operations engineer, rotating rig foremen, directional drillers, mud
engineers, tool hands, secretary and warehouse personnel for a land
rig operation in the Oriente Basin of the Amazon.
Project Manager, Trinmar Alliance - Point Fortin, Trinidad W.I.
(1995‑1996)
In charge of 3000'-8000' workover operations for an offshore
barge rig in the Gulf of Paria. Supervised a staff including
expatriate operations engineer, rotating rig foremen, logistics
coordinator and office secretary.
| BECHTEL PETROLEUM OPERATIONS |
1989 - 1995 |
Drilling Engineer - Elk Hills, CA (1991-1995)
Prepared 3000'-10,000' drilling and completion cost estimates,
rig procedures, AFE’s and documentation for regulatory agencies.
Designed and wrote a computer database for tracking drilling
information.
Production Engineer - Elk Hills, CA (1990-1991)
Monitored a 60-well reservoir under gas injection producing
12,000 BOPD. Also monitored an 11-well water drive reservoir
totaling 560 BOPD. Prepared remedial programs for 6000'-7000'
wells.
Database Engineer - Elk Hills, CA (1989-1990)
Designed and implemented a reservoir management database system
on an IBM 4386 mainframe computer. Developed COBOL screens and
relational database files based on current and future data
requirements.
| N.L. McCULLOUGH |
1987 - 1989 |
Logging Engineer - Bakersfield, CA
Supervised cased hole logging, perforating and pipe recovery
operations.
EDUCATION
B.S., Petroleum Engineering, Colorado School of Mines, 1986
Registered Professional Petroleum Engineer, California, 1993 -
Present
|